2021 Road Repaving Project

2021 Road Paving Project

Thanks to the City’s share of SPLOST funding, we’re investing slightly more than $7.8 million to repair and resurface more than 31 miles of Stonecrest roads as part of our 2021 paving program.

Stonecrest sets priority for repaving using the Paving Condition Index (PCI) score, which is an industry wide standard. This is a weighted score that factors in the road surface and road “roughness” (how a vehicle rides on the road). Sometimes these conditions are visible, such as potholes, cracking, and worn asphalt, while others are not and may need to be measured with special tools to help determine the final PCI score. Traffic volume on a road is also a consideration in determining the schedule the repaving.

By following a planned approach for road maintenance, the City can make the best use of SPLOST funding while working to provide quality roads for the community.

The list below shows the resurfacing projects planned for this year. You can also check them out on our interactive map.

Road Paving in Action!

Mall Parkway of the 2021 SPLOST Road Paving Project in Stonecrest, GA
Mall Parkway of the 2021 SPLOST Road Paving Project in Stonecrest, GA
Mall Parkway of the 2021 SPLOST Road Paving Project in Stonecrest, GA
Panola Road of the 2021 SPLOST Road Paving Project in Stonecrest, GA
Panola Road of the 2021 SPLOST Road Paving Project in Stonecrest, GA
Panola Road of the 2021 SPLOST Road Paving Project in Stonecrest, GA
DeKalb Industrial Way of the 2021 SPLOST Road Paving Project in Stonecrest, GA
DeKalb Industrial Way of the 2021 SPLOST Road Paving Project in Stonecrest, GA
DeKalb Industrial Way of the 2021 SPLOST Road Paving Project in Stonecrest, GA
McDaniel Mill Road of the 2021 SPLOST Road Paving Project in Stonecrest, GA
McDaniel Mill Road of the 2021 SPLOST Road Paving Project in Stonecrest, GA
McDaniel Mill Road of the 2021 SPLOST Road Paving Project in Stonecrest, GA
Miller Road of the 2021 SPLOST Road Paving Project in Stonecrest, GA
Miller Road of the 2021 SPLOST Road Paving Project in Stonecrest, GA
Miller Road of the 2021 SPLOST Road Paving Project in Stonecrest, GA
Snapfinger Woods Drive of the 2021 SPLOST Road Paving Project in Stonecrest, GA
Snapfinger Woods Drive of the 2021 SPLOST Road Paving Project in Stonecrest, GA
Snapfinger Woods Drive of the 2021 SPLOST Road Paving Project in Stonecrest, GA
South Goddard Road of the 2021 SPLOST Road Paving Project in Stonecrest, GA
South Goddard Road of the 2021 SPLOST Road Paving Project in Stonecrest, GA
South Goddard Road of the 2021 SPLOST Road Paving Project in Stonecrest, GA

2021 Road Paving Schedule

Street Name From To Planned Start Date Status
S Goddard Rd Klondike Rd Heights Ave SW 9/7/2021 Complete
Mall Pkwy Turner Hill Rd Stonecrest Pkwy E Fall Complete
Honeycreek Ct Mall Pkwy End Fall Complete
DeKalb Medical Pkwy Hillandale Dr Covington Hwy 8/6/2021 Complete
Rock Chapel Rd Braswell St State Route 124 Fall Complete
Railroad St Rock St Rock Chapel Rd Fall Complete
Minola Dr Miller Rd Panola Rd 9/1/2021 Complete
Klondike Rd Hayden Quarry Rd City limit Fall Complete
Mall Pkwy Klondike Rd Turner Hill Rd Fall Complete
Panola Rd Snapfinger Woods Dr Panola Way Ln 8/30/2021 Complete
Turner Hill Rd Hayden Quarry Rd I-20 WB Fall Commplete
McDaniel Mill Rd Falls Brooke Dr Rockland Rd 8/30/2021 Complete
Snapfinger Woods Dr Acuity Way Panola Rd 8/30/2021 Complete
Miller Rd Panola Industrial Blvd Covington Hwy 8/30/2021 Complete
Cleveland Rd Snapfinger Rd Rock Springs Rd 9/11/2021 Complete
Acuity Way Panola Industrial Blvd Snapfinger Woods Dr 8/30/2021 Complete
Woodrow Rd End Woodrow Pl 9/27/2021 Complete
Salem Rd Crossvale Rd Evans Mill Rd 9/24/2021 Complete
Rock Springs Rd Cleveland Rd Thompson Mill Rd 9/11/2021 Complete


Road Paving Map