Thanks to the City’s share of SPLOST funding, we’re investing slightly more than $7.8 million to repair and resurface more than 31 miles of Stonecrest roads as part of our 2021 paving program.
Stonecrest sets priority for repaving using the Paving Condition Index (PCI) score, which is an industry wide standard. This is a weighted score that factors in the road surface and road “roughness” (how a vehicle rides on the road). Sometimes these conditions are visible, such as potholes, cracking, and worn asphalt, while others are not and may need to be measured with special tools to help determine the final PCI score. Traffic volume on a road is also a consideration in determining the schedule the repaving.
By following a planned approach for road maintenance, the City can make the best use of SPLOST funding while working to provide quality roads for the community.
The list below shows the resurfacing projects planned for this year. You can also check them out on our interactive map.
Road Paving in Action!
2021 Road Paving Schedule
Street Name |
From |
To |
Planned Start Date |
Status |
S Goddard Rd |
Klondike Rd |
Heights Ave SW |
9/7/2021 |
Complete |
Mall Pkwy |
Turner Hill Rd |
Stonecrest Pkwy E |
Fall |
Complete |
Honeycreek Ct |
Mall Pkwy |
End |
Fall |
Complete |
DeKalb Medical Pkwy |
Hillandale Dr |
Covington Hwy |
8/6/2021 |
Complete |
Rock Chapel Rd |
Braswell St |
State Route 124 |
Fall |
Complete |
Railroad St |
Rock St |
Rock Chapel Rd |
Fall |
Complete |
Minola Dr |
Miller Rd |
Panola Rd |
9/1/2021 |
Complete |
Klondike Rd |
Hayden Quarry Rd |
City limit |
Fall |
Complete |
Mall Pkwy |
Klondike Rd |
Turner Hill Rd |
Fall |
Complete |
Panola Rd |
Snapfinger Woods Dr |
Panola Way Ln |
8/30/2021 |
Complete |
Turner Hill Rd |
Hayden Quarry Rd |
I-20 WB |
Fall |
Commplete |
McDaniel Mill Rd |
Falls Brooke Dr |
Rockland Rd |
8/30/2021 |
Complete |
Snapfinger Woods Dr |
Acuity Way |
Panola Rd |
8/30/2021 |
Complete |
Miller Rd |
Panola Industrial Blvd |
Covington Hwy |
8/30/2021 |
Complete |
Cleveland Rd |
Snapfinger Rd |
Rock Springs Rd |
9/11/2021 |
Complete |
Acuity Way |
Panola Industrial Blvd |
Snapfinger Woods Dr |
8/30/2021 |
Complete |
Woodrow Rd |
End |
Woodrow Pl |
9/27/2021 |
Complete |
Salem Rd |
Crossvale Rd |
Evans Mill Rd |
9/24/2021 |
Complete |
Rock Springs Rd |
Cleveland Rd |
Thompson Mill Rd |
9/11/2021 |
Complete |
Road Paving Map